污18禁污色黄网站_精品 无码免费国产网站_亚洲免费美女视频一二三区_亚洲系列无码专区人妻无码_草莓视频黄色app_日韩三级久久_韩剧高清电影_国产成人精品午夜福利网站_丰满人妻熟妇又伦精品一_亚洲欧美黄色大片

Correct installation method of bathtub
  • Date:2022-01-12
  • Read:5722

The correct installation method of bathtub, yasiluo tells you! If there is no special staff to help you install the bathtub, it depends on your hard-working hands! The following is the specific installation method of the bathtub. I hope it can help you!?
 

Method / step:

Before installing the bathtub, first check whether the bathtub is complete and undamaged, and before placing it in the installation position, waterproof the parts of the bathtub that are easy to leak with silica gel, especially at the water outlet and the water pipe connecting the motor.

Place the bathtub at the installation position and place the drainage pipe well to ensure smooth drainage. Constantly adjust the anchor screws so that all anchor screws can land safely to ensure the level of the cylinder block.

As the bathtub is also an electrical product, it will naturally use electric energy in the process of use. Therefore, waterproof must be done around the grounding plate to prevent leakage accidents. Listen to whether the sound of the motor is normal. If there is no abnormality, connect the cold and hot water pipes with corresponding tools.

After the cylinder body of the bathtub is installed, its parts need to be installed. After the parts are installed, adjust the position of the bathtub to the best position. Then turn on the water and electricity, check whether various functions operate normally and make appropriate adjustments.



Drain the water in the cylinder to see whether the falling speed and displacement are normal. Wipe the remaining water droplets in the cylinder body, protect them well with a film, and then use them after a certain time.

PREV

Yasiluo product: floor type bathtub faucet

NEXT

How has the sanitary ware industry performed in recent years?